Energy Voice | Subsea 7 picked for major project at Shell’s Shearwater platform – Auto Republish


Energy service giant Subsea 7 has won the contract for a major North Sea infrastructure project with Shell.

Shell is modifying its Shearwater platform in the central North Sea as it prepares to handle production from more fields in the vicinity.

Dry gas produced by the Shearwater platform currently flows via the Seal pipeline to Bacton on the east coast of England.

Shearwater will be modified and a 23 mile pipeline will be installed linking the installation to the Fulmar Gas Line.

This will allow wet gas to flow into the Segal pipeline.

The gas will initially be processed at the St Fergus plant near Peterhead prior to onward transmission of natural gas liquids to Mossmorran in Fife, where they will be separated and exported to customers.

Read: Shell’s Shearwater hub could help discoveries in ‘development purgatory’

Luxembourg-registered Subsea has been picked for the Shearwater-Fulmar gas line re-plumb project.

It will provide the 23-mile export line, a rigid riser, control jumper, subsea structures and associated subsea tie-ins.

Work on the project has already begun at Subsea 7’s base in Westhill, near Aberdeen, with support from the firm’s office in Glasgow.

Offshore activities are scheduled for 2019.

Oslo-listed Subsea 7 said the contract was worth somewhere between £40-120 million.

Jonathan Tame, vice president UK and Canada at Subsea 7, said: “For many years Subsea 7 has been chosen by Shell to provide engineering and project execution expertise in the North Sea.

“This latest award further demonstrates our ability to design the right engineering solutions that ensures a safe, effective and cost-efficient project delivery.”



Source link

This post was automatically re-published from 3rd party sources without human review. The content may not reflect the views of the Mossmorran Action Group and was reposted due to containing keywords that are of interest to the Action Group. If you feel the content is inappropriate please contact us and we will review the post.

Leave a Comment

Your email address will not be published. Required fields are marked *

Resident-led action group seeking redress from the long-term social, health and environmental impacts from the Mossmorran facilities in Central Fife operated by ExxonMobil (Fife Ethylene Plant) and Shell (Fife NGL).

Contact

  • 6 Ballingry Street, Lochgelly, KY5 9NW
  • Mail : info@mossmorran.org.uk

Press Inquiries

  • Mob.: 07749 902 934
  • Tel.: 01333 720 378
  • Mail : press@mossmorran.org.uk

RT @ayewecan1: Gas leak at Mossmorran plant in Fife prompts safety probe https://t.co/X88Ilb0akT

Scroll to Top